The Rocky Ridge Hardrock material site is administered by the KPB Land Management Division. The division will issue all permits / contracts for the sale of materials. Commercial quantity requests for material may be considered on a case-by-case basis based on compatibility with borough operations at the time. All sales and mining plans shall be negotiated.

The KPB Land Management Division’s Seldovia-Rocky Ridge Material Site is concurrent with the expansion plans for the Seldovia Landfill. The site is located about 1.5 miles south of the Port of Seldovia on the west side of Rocky Street in Seldovia, Alaska.

Site Map

2015 Mining Plan

2013 Site Plan

2012 Topographic Survey

Material Testing Results

Seldovia Testing image